Hi,
We are going to perform SAP NW BPC upgrade from BPC 10.0 SP9 to BPC 10.1 SP8. Please share the upgrade check list which can use as part of pre/post Upgrade activities.
Reporting tool: EPM
Database: Oracle 11.2.0.4
Note: Our BW version (where BPC resides) will also be upgraded from NW7.31 SP6 to NW7.4 SP13
Thanks,
Robert.